Red Moon
Engineering trial - Day 2 of 5
Windy day, we moved operations as close to land as possible to have smaller waves. But all in all a pretty successful day. We decided to just go ahead and test everything at once rather than step-by-step, and most worked :)
-------------------------------------------------------------------------------------------------------
Gimp:
only unsharp mask because of resize because of low upload data rate on the ship
202
views
- 0
- 0
- Canon IXUS 130
- 1/8
- f/5.9
- 20mm
- 800
Comments
Sign in or get an account to comment.