Drysailor

By Drysailor

A bit full !

Back Home again!! After waiting for 90 minutes on Dover Harbour, ( I can think of better ways of passing the time) We loaded and the Ferry took off like a scalded cat. Did the crossing Dover- Calais in 72 minutes. The ship was packed full, this is because Sea France is on Strike (Again!!) and Operation Stack was in force. This means they use the Motorway M20 as a Lorry Park, like 20 miles long! Total Chaos. When driving thru France no sign of any tail backs or Lorry parks, strange. Got home in the daylight and snapped our boot really fully packed, all in now, had our tea and just unwinding. Gets more difficult every time, this long distance driving. Do a better one tomorrow, thanks for all the kind regards.

Comments
Sign in or get an account to comment.