Further Progress

One or two people commented yesterday, agreeing that there was progress, but assuming that it was slow progress.  Today we have some fifteen plus metres of outer brick wall, up to damp proof course level erected; I do not think that is slow progress.  If I was doing this it would be much slower progress, but I am not physically capable of doing this sort of work at the present time, although I do intend to become so, in the future.  This picture shows perhaps half of the wall that has been built, by one bricklayer in one day, to a good build standard; straight, level and well finished.
 
 
 

 

Comments New comments are not currently accepted on this journal.