Fast Progress
Yesterday one of our workers started to fit the joists, noggins, etc., to support the floor of the rebuilt conservatory, whilst the other continued working with the block work. Today, as I wanted a picture of the floor, before all of the insulated blocks went in I had to take this picture, even though the light was not ideal, as by early tomorrow it will be too late. The block work is almost up to roof level, nearly ready for sealing to the steel structure. The joists etc., are complete and much of the insulating material has already been fitted between them, once this has been done a temporary sheet ply floor will be laid over the top until the structure is made weather tight, when the proper flooring will be fitted; it has been very rapid progress.