Site for sore eyes
Extension Project: Day 10
I was a grim, horrible day for the builders, but the guys soldiered on.
The first lintol was installed today, meaning we are getting near the stage where we have a second floor.
Unfortunately, the photo is really crap.
154
views
- 0
- 0
- Nikon D3100
- 1/60
- f/3.5
- 18mm
- 3200
Comments
Sign in or get an account to comment.