pandcjane

By pandcjane

Inching Forward

Alan the tiler has now been and the area round the basin is looking pretty good. There is a problem with the taps which I am not sure can be sorted. Have to wait on that one. Ray the plumber has installed the bath and shower athough apparently there are still 2 legs missing from the bath. He still has to put up the shower screen and the bath panel. Most frustratingly he won't put the WC back in until after Alex the flooring chap has laid the floor. That was supposed to be Friday or Saturday. But now he tells me that the flooring wont be delivered till Tuesday. So no WC till Wednesday at the earliest. (or indeed shower screen). Reading this through I realise that this is very much a 1st world problem and nothing here is exactly life threatening. 

Comments
Sign in or get an account to comment.