View from another Bridge
Well, the Brighton train at Blackfriars Station. The top of the Shard had disappeared in the mist.
Sleeper, breakfast, shower, tube, walk in the rain, 3 meetings, not much lunch, walk in the rain, tube, train.
Now at Gatwick and flight already delayed by 15 minutes.
Hopefully back in time for food before choir.
Comments
Sign in or get an account to comment.