The hedge was removed today, well, half of it. The length of the hedge is about 30 metres, so we have had just over half of it taken away. The tiles are being delivered on Tuesday, so we will start tiling on Thursday.
When we have finished tiling the first 15 metres, we will have the rest of the hedge removed and then finish tiling. It will be a long job.
Then 2 tonne of gravel to be delivered, and barrowed in and spread over the existing gravel, just to finish the job off.