Overhead
At unit EC 5: two overhead cranes at rest.
The lower one is a single 20 ton crane, the upper one can do 90 tons and 20 tons.
Quiet day today, three units running which we'll have to stop this evening; the nightshift has to start-up two units at the end of their shift.
Here in LARGE....
320
views
- 0
- 0
- Nikon D90
- 1/3
- f/7.1
- 28mm
- 250
Comments
Sign in or get an account to comment.