BLynne

By BLynne

The "Project" : 4

I don't know what the machine is called - 5 meters long, about 1.5 meters wide.  The geotechnicians arrived to test the ground.  A 6-meter drill down, then a probe in which they forced water and azote to test the resistance... The other guy dug (old fashioned way - with a shovel!) a hole 70 cm deep, to test the saturation level for the future septic tank and drainage. All very technical for me, but necessary, I'm told, for the project!

Comments
Sign in or get an account to comment.