Watching plaster dry
Waiting for plaster on the hard to dry out before emulsion and kitchen fit. Kitchen, so I've been told, is coming today but can't be fitted yet. The upside-down blue swim cap on the ceiling is a dust cover for the hard wired heat detector.
39
views
- 0
- 0
- Olympus XZ-1
- 1/25
- f/1.8
- 6mm
- 200
Comments
Sign in or get an account to comment.