clairep

By clairep

Getting ready.

Today I have mainly tidied up ready for when the builders start on Tuesday. I have moved all the tools out the way, and emptied the lean too and the workshop. I also had a little fire to burn some of the wood left in the garage.
The picture shows the lean too and the kitchen and bathroom which are coming down and being replaced with a two storey extension, and the outbuildings (workshop and outside toilet) which are being ripped down so we can have nice big patio doors. The bottom picture is the existing kitchen and lean too which will be replaced with a nice kitchen and downstairs toilet.
I'm so excited for th work to start!

Comments
Sign in or get an account to comment.