Looking a bit better.
Today we have filled a skip. We have moved all the plasterboard and rubble from the front and the old bath and loads of junk from the back. There is still loads of rubbish, cardboard and polystyrene but we have a second skip coming this week so hopefully will be tidy soon. We had a fire and burnt loads of wood and I swept up all the leaves and fallen apples. Stu then fitted the skirting board in the downstairs toilet and I sanded it down and started filling the holes.
100
views
- 0
- 0
- Samsung SM-A300FU
- 1/40
- f/2.4
- 3mm
- 80
Comments
Sign in or get an account to comment.