Plumbing
We are awaiting the plasterer, who is due to come back and finish off (between 1 and 4, they said - it's now 4.30). At this rate, we might have to resort to another takeaway tonight. Mind you - though our workers have been a bit chaotic regarding their timings, at least they are doing a good job. And they have left the house tidy every evening.
Meanwhile, the kitchen sink has been draining very slowly, so W decided enough was enough. He'd previously done the obvious - removing the U-bend and trying to rod the pipe from the sink end - with no success. So today, even though it has been the most horrible weather - rain and cold - he tackled it from outside, which involved cutting a piece out of the pipe beyond where it emerges from the wall. Then rods, hosepipes and general bloody mindedness has finally sorted it. Followed by a trip to Screwfix to get pieces to repair the pipes.
Comments
Sign in or get an account to comment.