Ready for the concrete
All the batons are in now and levelled up.We hope to have the concrete done on Monday about 8 cubic metres should do it.
Helen and I have finished building the pallet cages and sawn up the logs from the top of the nursery.
The tray washing and the pots being trayed up are both nearly done.Hopefully the second batch of Spring Viola will be ready for transplanting next week.
Em back from training at Hardwick Hall and Becky getting her latin tutoring started.
Comments
Sign in or get an account to comment.