Sparkling

Back to normal shiftwork again.
One unit on the grid; maybe some more this coming week?

This is a picture taken during the overhaul of unit EC 7.
A lot of work; mainly at the control system but also at the boiler.
This picture was taken at the 6th floor.

Better in LARGE....

Comments
Sign in or get an account to comment.