Bank Street, Inverness, and the Greig Street bridge over the River Ness, from the Old High Kirk at lunchtime.
Major works underway to prepare for some flood defences being built. They were doing survey works in the Summer, and now this fairly major street in Inverness will be closed off for six weeks, while they move/work on all the services. Presumably to prevent them for providing a path for potential flood water to spread past the defences (I could, of course, be wrong!).
Nikon F100 : f/8 : 1/1000" : 28mm : ISO400
Lens: Voigtlander 28mm f/2.8 Color Skopar SL II
Film: Ilford Delta 400 (B&W negative)
Comments New comments are not currently accepted on this journal.