Blob the Builder

By Blobinski

Interceptor Drain

Persisted despite the dreich day, and completed the 1st phase of the french drain... consisting of a flexible perforated pipe bedded on pea gravel at the bottom of the trench,which is filled with larger gravel, all of which is surrounded by a porous geo textile...the white stuff!

Comments
Sign in or get an account to comment.