Working on a new road.
Piles are driven into the ground before it is time for the new road its bridge piers.
Bank force with a four-tonne lump dropped from above on each concrete pile takes between 30 minutes and one hour and a half.
With the help of computers a company in Gothenburg can read the result! (According to our local paper).
126
views
- 1
- 0
- Panasonic DMC-TZ30
- f/4.7
- 10mm
- 100
Comments
Sign in or get an account to comment.