Sometimes

By powerplanter

In the background

This is a part of unit Eems 20.
Picture is taken between the (electrically driven) stopvalves and 1000KW electric motors of the condensate pumps.
In the background the (lightgrey) module can be seen in which the completely new gassystem fort unit 7 is installed.
The module is waiting at Eems 20 to be fitted during the major overhaul of unit 7 in the near future.

Comments
Sign in or get an account to comment.