Floors, doors and shower
Left to do..
They all left today, bathroom almost complete, just the shower to be wired by the electrician. Doors to be hung when they arrive and we need flooring and a blind.
The fence got put up, the skip filled and it went today. So fairly tidy outside now.
In two weeks N is back to block pave the drive and shorten the wall and grub out the hedge.
Then Phase 3 can begin.
Whew!
Thanks for calling in.
Stay safe.
1 extra of the boys cutting the wall panel in the rain.
X
186
views
- 15
- 0
- Huawei CLT-L09
- 1/50
- f/1.8
- 4mm
- 64
Comments
Sign in or get an account to comment.