Ed
Today I was with Field Services, a contractor from Auckland. During Lockdown in March I assisted them installing Data Loggers in the Stormwater and Wastewater network. From there I was with them every 10 days. Today we removed the loggers, Ed is ready to make a Confined Space Entry.
81
views
- 5
- 0
- Samsung SM-G390Y
- 1/10000
- f/1.9
- 4mm
- 400
Comments
Sign in or get an account to comment.