Polytunnel Progress
A day of a bit of creative stuff, a bit of admin and a bit of polytunnel work. This is for MotherShipton, to show the polytunnel progress. On the left hand side is part of the new raised bed and the raised area for containers made from angle iron from an old cattlegrid. On the right is part of a cupboard bought from MESS, the staging and above is some bodged extra shelf space made from left over staging parts (plus some old fridge shelves) and odd bits of wood (probably not a permanent feature). I've put the bench in there for the winter months. The extra is the compost bin area, complete with hinged gate, the one on the right still needs some work on it.
Comments
Sign in or get an account to comment.