Costly exercise
Today my team repaired a Wastewater serviceline and worked with a Plumber to do a full repair, the Plumber removed some old inspections and replaced them with a new MAP (maintenance access point) while we did a repair and connecting onto his Joint. We will have a lot of jobs like this in the future as the Cable laying contractor is working on a guess where the assets are. At least our Client will bill them for this.
85
views
- 3
- 0
- Samsung SM-G390Y
- 1/100
- f/1.9
- 4mm
- 64
Comments
Sign in or get an account to comment.