Day 125/21. My next little job.
The flight deck of our Sandringham flying boat is now complete, fully instrumented and ready.
The next little job for me is to replace the missing instruments and switches in this cockpit. It is from our Supermarine Swift.
The blank panel at the centre top is supposed to have several switches and gauges. They were removed to put into the cockpit of our 'other' Supermarine Swift, currenty under early restoration. My task is to replicate them in a decent photoshopped reconstruction. Should be easy enough.
Comments
Sign in or get an account to comment.