Two goes
When the Fibre drilling crew installed this Duct, they had two goes at drilling it and still got it wrong. This 150mm PE Wastewater Lateral has been drilled through twice. Our role is to expose the pipe, another contractor will cut section out regrade the pipe as it is running backwards and weld a new section in.