Fly (Day 2258)
Down to Holm this morning after a misty wander up the hill with Sigyn. There was a list of things which would be ready for me to do today, but the majority of them are still a long way from the point I will be able to do anything with them.
I spent the morning re-routing a soil stack inside the building, but there is now no external drainage to connect it to, meaning two bathrooms are completely out of action. One of the bathrooms is an en-suite which has been waiting for flooring to be be done before I could fit the washbasins and re-fit the WC. Some of the flooring has been done now so I was able to sort out the basin wastes this afternoon, but with the splashbacks and top for the unit not fitted yet, I couldn't really progress much further. Fitting the WC can wait until the soil pipe is connected to drainage.
Back at home, I had a wander round the garden looking for a blip while I waited for my beautiful wife to return from doing hoss stuff. This little guy stayed still enough for me to grab a couple of really quick shots.
Comments
Sign in or get an account to comment.