Unexpected (Day 2329)
Back to the bathroom re-fit this morning, and I spent a while lifting another bit of the floor to alter pipework ready for the basin to be fitted. With the pipework done and the floor back down, I got a little bit of plasterboarding finished off.
Having done the plasterboarding a quick measurement confirmed that the unit and basin would not fit in the space. Another tradesman had built a partition and hasn't measured carefully enough. I am very glad it wasn't me!
I cleared out for the day early and headed home. Sigyn was delighted to get out for an unexpected wander in the heather above the Lyde road.
Back home to catch up with the continuing adventures of my beautiful wife.
Comments
Sign in or get an account to comment.