Construction site of the new bridge across the railway at Inverness Campus. After a long spell of inactivity, the site was buzzing this morning, and the main span of the bridge had appeared on site and was put in place (a lunchtime snap through the barrier).
Nikon F100 : f/11 : 1/160" : 58mm : ISO 400
Lens: Voigtländer 58mm f/1.4 Nokton SL II
Film: Ilford XP2-Super 400 (B&W negative)
[Frame : 01]
Comments New comments are not currently accepted on this journal.