Turbine floor at EC 20 in HDR

At left: a piece of de casing of the HP and MP steamturbine, in the back some ducts and piping of the main boiler and on top at the right the feedwatertank.
The red thing is the head tank with water to regenerate the resins in the so called condensate cleaning system.
On the so called 9 meter floor (intermediate) are the condensate- and feedwater pre heaters and on the far right is the start up feedwaterpump.