WIP!

2 back box holes cut and boxes dry fitted. Channel cut for power to them as well. The tricky bit is making the required hole down behind the lower tiling to exit under the worktop.

Once that’s done (1 achieved) the wiring will be put in place and all made good before M comes to connect it all. Obviously the boxes will be fixed prior to making good.