More horses (Day 2517)

Off to town this morning to make a start on the second fix for a shower room. The customer has done all of the first fix himself, then done all of the plasterboarding so all of the pipework is hidden in the walls.
It took a while to get the loo in place, mainly because the soil pipe was concreted into the floor in the wrong place. More annoyingly the supplied seal which goes between the cistern and pan was damaged and leaked. Luckily the one I had in the van saved the day. The basin was a bit of a pain to fit too, but I got it done.
I spent a little while after lunch sorting out the waste for the shower tray, but decided it was probably too late in the day to be starting to concrete it in so headed for home.
When I got home,  my beautiful wife was off doing hoss stuff so I thought it was time I got out a run on my bike. A fine, but chilly, way to finish the day.

Comments
Sign in or get an account to comment.