Bath
So the plumber came and did his thing. There was some metalworking to fix the leak from the shower tap. He has also replaced the seal around the bath. To do this he started by filling the bath with water so that it was stretching the seal, doing the seal without the bath being under load would mean that it would split as soon as I got in. So now I have a bath full of water while the seal sets; 24 hours in total. That's exciting isn't it?
Comments
Sign in or get an account to comment.