Moving on

A good day today starting just after 9 and finishing before 6.
All drained down, the central heating headers cut back and capped, the hot water cylinder out and in the loft most of the now redundant vent pipe work out as well.
Hope to finish pulling out the vent pipes and re-plumb the shower supplies tomorrow- assuming I can get the Tectite Classic push fit connectors to let go that is.

I said it was going to get boring — fancy a blip of the loft tomorrow?

Comments
Sign in or get an account to comment.