It's coming along

After a faltering start we have a new crew on the conservatory building. Very pleased with the progress the two new blokes are making with digging the footings. They are very deep, have to be down to the level of the house footings, as you can see from the amount of stuff in that large skip. Not finished yet so the skip truck was dropping off an empty one. This involved putting the full one into the new, empty, skip, unloading both of them and then reloading the full skip back onto the lorry.
The building inspector is coming tomorrow to make sure the footings are abiding by the regulations.

Comments
Sign in or get an account to comment.