Spare room anyone?
It's been a month since I blipped the treehouse, and things have managed to move on quite a bit.
Here it is on the 5th April, and the 7th April.
It has 3 sides more or less done, and just needs a door for the front, a roof, and some wood / ventilation on the sides.
Once all that is done, then and only then I'll do some steps / ladder up to it. Until then C gets a lift up from me on the stepladders.
It has been, and still is, a very organic development and as a result it is a little bit bigger than I intended.
The two beams that are framing the roof are about 2.3 metres long!! Here it is large
But it allows the boys to have their own den; a treehouse that is not actually even touching the tree.
Hopefully if I can get enough free times over the weekends, it will be ready for the summer holidays!
Comments
Sign in or get an account to comment.