Skeleton
Structure of a Bridge before the deck is installed.
It is part of a SWPPP - Storm Water Pollution Protection Plan. Much earth must be removed to allow storm water to flow freely under the roadway. The bridge(s) will provide for six lanes of traffic plus bike lanes.
A color version can be found here.
78
views
- 0
- 0
- Canon EOS 5D Mark III
- f/8.0
- 24mm
- 200
Comments
Sign in or get an account to comment.