Another brick in the wall
Another very hot day. Our visitors included the brickie who came to replaced the two separate bricks that were damaged when they were installing the cables for the internet. Which is still not set up yet. And the lady from OpenReach to check on the situation.
Lots of time on the phone to a variety of agencies and businesses with variable success.
The most productive time was after 6 when S arrived dropped off Olive, went to collect the pizza for dinner, before doing jobs. He fitted two ceiling lights, fitted the house number plate, marked up the position for a mirror and help me measure up for a net curtain for the landing window. He got a lot done in a short period of time.
Comments
Sign in or get an account to comment.