Atelier Rojans 70
The tiling has begun, rather late, but still, they started. This is one of the en suite bathrooms. A toilet, a washbasin and a shower will be fitted. The last tiles will come after the shower is in place.
I backblipped three more blips today.
Trail link: 69 under the stairs.
446
views
- 0
- 0
- Fujifilm FinePix S6500fd
- f/2.8
- 6mm
- 100
Comments
Sign in or get an account to comment.