21/01/24_Busy week ahead.
On 3 January I blipped the before and after of the old summerhouse demolition.
Well because there was space in the skip (lets be thrifty) Chris decided the rotten decking, I had talked about should go.
The top picture is the current position. For practical reasons the deck was built in two bits. The 2010 has now gone the 2014 bit survives for now.
The bottom picture is the new materials – because of the weather I have stored it in the conservatory since 12 December.
It will be nice to get the space back in the conservatory.
Comments
Sign in or get an account to comment.