Railway tunnel path
Looking at the entry of the Rodney Street tunnel, with cherry trees in full bloom.
Electrician in first thing; still not quite done, since the movement sensor switch he fitted was defective. The last of the single bulb pendant lights have been replaced, so I now have six to find homes for ..
Out in the afternoon once the weather system had mostly moved through. The drain on the main path in George V park has blocked again making for a substantial puddle. To the Botanics; tea at the re-opened Inverleith cafe, which was very quiet. Left some oatflakes for the robin, which tweetled at us.
At Inverleith pond the ducks and pigeons were happy to eat oatflakes; the swans were willing to investigate. One adult and three of last year's cygnets still in residence.
Back by the rather muddy Rocheid path.
Comments
Sign in or get an account to comment.