Mosaic ...
... on the Beithir at Stockingfield Bridge Park.
The extra shows the position of this mythical creature beneath the bridge.
The mosaic tiles are being designed by locals and added to the structure. So far the head has been done but there's all of the body which weaves it's 121metres through the park still to be covered. It's estimated it will take five years to complete.
More views of it in an earlier blip on 7 March.
For AbstractThursday. Thanks to Ingeborg for hosting.
Comments
Sign in or get an account to comment.