Full flow
After taking the "Culvert" Blip on the 4th I thought I should show where it goes so the main Blip shows from the other side of here. The tunnel that can be seen goes under a crossing and a road to where Kasper was carrying out his inspection.
The first Extra is from the small bridge where I took the main Blip but facing North instead of South.
The second Extra is after it goes under SH6.
The third Extra is the route out into Tasman Bay.
All taken at the peak of a 3.9 metre tide.
It was a big engineering job which has gone on for near three years.
A day mainly overcast but 17 degrees was seen and no rain as yet but there was a big rumble of thunder.
Comments
Sign in or get an account to comment.