Another flower (Day 3455)
A bit of an earlier start today at the bathroom re-fit meant I was the first man on site. I got underway with fitting the shower enclosure and managed it in fairly good time. I had a trip to the suppliers to collect the basin, vanity unit and WC, then back to the job to get them fitted.
The basin was done by lunchtime and after lunch I patched a bit of plasterboard next to where the loo was to go before fitting the loo.
I finished off with a tidy up and clear out of all my stuff before getting the shower enclosure sealed.
Back home for an evening with my beautiful wife before she heads south for the weekend.
Comments
Sign in or get an account to comment.