Progress

The ensuite must be coming along: we've now picked the flooring which is going in next week.

After the floor, all that's left to do is the final plumbing for shower, basin, and loo, tiling round the basin, installing the towel rail, choosing and fitting a bathroom cabinet and shelves, installing the downlighters and waiting for the shower door to arrive and be fitted.

Anyone think we'll be ready for Christmas?