Future Tracks
A walk up the line to check for any fallen trees or other damage and none found. This is a look up the line from our current limit of operation at Laigh Farm Crossing. The line was previously used for coal trains and negotiations are ongoing with the owners to obtain the permissions to be able to run on the line after the necessary maintenance work has been undertaken.
Doon Valley Railway
Comments
Sign in or get an account to comment.