Waiting

This pipeline crew is waiting for the directional drill coming from across the highway. The drill will pass 10 feet under the road and come up here. Then a piping sleeve will be attached and the assembly wil be pulled under the road. After that the actual pipeline will be threaded through the sleeve and connected.

Comments
Sign in or get an account to comment.