all closed up
backfilled and cemented. same with the powder room on the other side.
the wood boxes are forms. I'm not 100% lined up with the bathtub drains, no way to know exact alignment till theyre installed. so I left an empty space and the traps at the bottom aren't glued yet. so when the cement dries, ill take the forms out and be left with enough room to align the tub drains then back fill and cement the holes. better safe than sorry.
23
views
- 0
- 0
- Htc One S
- 1/11
- f/2.0
- 4mm
- 463
Comments
Sign in or get an account to comment.