Life Of A Renovator

By shawnhuk

electrical begins.

sub panel going in. main 200 amp is totally and completely full. it made more sense to put in a sub panel on the other side of the basement in the furnace/utility room for all the basement circuits. so a 100 amp 12/24 panel goes in. all the #3 teck cable went in nice. all the afci protected (blue) bedroom cable going in right now.

Comments
Sign in or get an account to comment.