Geoff Milner

By cyclone61

Croix du Pape building

The first supporting wall for the ramp road to the garden at Auberge de la Croix du Pape has been finished and the trench for the second wall foundations have been dug. The giant frame on the left is used to make formwork for the cement pour. A giant sandwich with a doorway left in the middle to move between areas under the finished ramp road.

Comments
Sign in or get an account to comment.